Texas A&M University System is developing a new Health Science Center campus on a green field site of 140 acres in Bryan, Texas.
The first development of the site includes a research building and Health Professionals Education Center. The campus will ultimately be developed to include 3 million square feet of buildings, including a relocation of the medical school, research and teaching facilities, and a hospital.
SSA was on the team selected to prepare the master plan, programming for the first two buildings, and provided the mechanical and electrical engineering to determine the present and future thermal and electrical utility requirements for the campus. The first phase of construction includes a central plant to provide thermal and electric utilities for the new buildings. The master plan will also address the expansion of the central plant facilities as the campus grows, and the development of campus mechanical, electrical and plumbing design standards.
SSA also provided MEP design for the central plant, thermal and electrical distribution and design for the first two buildings on campus. The electrical service design consisted of coordination with the local utility company, design of electrical distribution switchgear, underground duct bank system for the campus, and electrical distribution equipment for each building.
Central Utility Plant
The Central Plant building is an 11,000 gross square foot building houses the water cooled chillers and heating hot water boilers for the entire campus. The building and thermal distribution system is designed to be expanded as the campus grows. This initial phase includes 3 – 600 ton chillers and 2 – 250 hp hot water boilers.